As a consequence of producing troubles, shipping and delivery delays happened for a few J 35D subsystems, resulting in the two initial J 35D collection getting shipped with only portions of the prepared avionics put in.Prior to it had been decided to build the JAS 39 Gripen inside the late 1970s, an intensive study was undertaken on an AJ 35 modifi